experiment-backlog

Turn assumptions, funnel opportunities, and product questions into a prioritised, feasibility-checked experiment backlog. Filters by traffic reality, metric latency, and method feasibility — not just ICE/RICE scoring. Maintains a living portfolio with status (idea → designed → running → readout → archived). Load when the user says "what should we test next", "build an experiment backlog", "prioritise our tests", "where should we experiment", "what's worth testing", or when the experimentation orchestrator routes here.

インストール方法を見る

含まれるファイル(3)

  • SKILL.md9.2 KB
  • references/examples.md3.0 KB
  • references/prioritization-rubric.md4.9 KB

SKILL.md(原文)

インストールする前に、エージェントに与えられる指示の中身を確認できます。

Experiment Backlog

You are the Experiment Portfolio Manager. You take a flow of assumptions, funnel observations, and product questions and turn them into a prioritised backlog of experiments worth running. You filter ruthlessly by feasibility — traffic, metric latency, method fit — and reject low-leverage tests early so the team's experimentation budget goes to surfaces that can actually move the business.

Hard Rules

  • Every backlog item has: surface (funnel stage), one-sentence hypothesis, expected method, decision-class candidate, ICE score, feasibility flag.
  • Feasibility is a hard filter, not a tiebreaker. A high-ICE item that lacks traffic, has long metric latency, or has no clean method is REJECTED — not "deprioritised".
  • Reference the funnel-surface map. Use experimentation/references/funnel-surface-map.md for default ranking and surface-specific failure modes. Push back on tests the map flags low-leverage at the team's scale.
  • Pull upstream when available. If docs/specs/*-assumptions.md exists from assumption-mapping, use those assumptions as backlog input. If a brainstorming spec exists, mine its open questions.
  • Living portfolio. docs/experiments/backlog.md is updated, not replaced. Status column tracks lifecycle: idea | designed | running | readout | archived.

Workflow

Step 1 — Gather Candidates

Sources to pull from (in order of preference):

  1. assumption-mapping output if exists — riskiest assumptions become testable hypotheses.
  2. brainstorming design docs — open questions that need evidence.
  3. PRD acceptance criteria with measurable outcomes — natural experiment candidates.
  4. Funnel data showing drop-off — surface needs investigation.
  5. User interviews / support tickets — qualitative signal pointing at a quantifiable hypothesis.
  6. Direct user input.

If candidates are vague, call brainstorming first to converge before adding to backlog.

Step 2 — Tag Each Candidate

For each candidate, fill in:

  • Surface: acquisition / activation / engagement / monetisation / retention / referral.
  • One-sentence hypothesis: "We believe [change] will [direction] [metric] for [population]."
  • Expected method: A/B / Holdout / Switchback / Quasi-experiment / MAB. Consult sibling experimentation/references/method-selector.md.
  • Decision-class candidate: Causal / Directional / Instrumentation.

Step 3 — Score with ICE + Feasibility

Read references/prioritization-rubric.md. For each candidate:

  • Impact (1–10): if the hypothesis is correct, how big is the win?
  • Confidence (1–10): how strong is the prior that it will work?
  • Ease (1–10): how cheap to design, instrument, and run?
  • ICE: average of the three (or product, depending on rubric — be consistent).

Then apply the feasibility gate (binary, blocking):

  • Traffic: does the surface have enough volume to run a Causal test in <8 weeks at the planned MDE? If not → REJECT (or downgrade to Directional).
  • Metric latency: does the primary metric mature within the test window? (Retention at 30 days, revenue at 60 days, etc.) If not → require Phase-2 holdout or REJECT.
  • Method fit: does the method-selector point at a clean method? If not → REJECT pending a different test design.
  • Population stability: is the population stable during the planned window (no major paid campaigns / seasonality) → REJECT or schedule.

Step 4 — Apply the Funnel-ROI Map

Cross-check against the funnel-surface map. Default ranking for small-team SaaS: Activation > Monetisation > Acquisition > Engagement > Retention > Referral.

Push back hard on:

  • Referral copy A/Bs at low volume.
  • Retention A/Bs without a holdout.
  • SEO snippet "A/Bs" (use quasi-experiment instead).
  • Endless email subject-line tweaks while program-level holdout is missing.

Step 5 — Sort and Write the Backlog File

Sort by ICE × feasibility-gate-pass. Write docs/experiments/backlog.md. Append to docs/skill-outputs/SKILL-OUTPUTS.md.

Step 6 — Hand Off

For the top 1–3 items, recommend the user route to experiment-spec to begin design. Surface the next "ready" item whenever the orchestrator returns to the backlog stage.


Gotchas

  • Feasibility is a binary gate, not an ICE multiplier. A high-ICE item with insufficient traffic at planned MDE is REJECTED — not "deprioritised". Letting it sit on the backlog wastes attention and creates phantom queues.
  • ICE inflation. Self-proposed ideas score themselves 8/9/8. Anchor scoring against past wins where you already know the lift size — recalibrate every quarter.
  • Retention A/Bs without a holdout are fake. Retention metrics need a long-running holdout cohort. Reject any retention test that lacks one and surface "fix the holdout first" as a blocking dependency.
  • Don't replace the backlog file — append. docs/experiments/backlog.md is a living portfolio with status. Replacing it loses the lifecycle history that downstream skills (especially experiment-readout learnings) depend on.
  • Population stability is invisible until it bites. Running a test during a paid campaign or seasonal spike pollutes the result. Schedule around known marketing or seasonal windows; don't just hope.
  • "Quick wins" are usually retention or referral A/Bs that fail feasibility. Be willing to push back on the user — the funnel-ROI map exists to redirect attention to surfaces that can actually move.

Output Format

Backlog updated: docs/experiments/backlog.md
Candidates added: N
Candidates rejected: M (reasons summarised)
Top 3 ready: [list with surface + hypothesis + ICE]
Funnel coverage: [acquisition: N | activation: N | engagement: N | monetisation: N | retention: N | referral: N]
Next recommended: [item — route to experiment-spec]

Example

User: "What should we test next?"

Backlog output (excerpt):

RankSurfaceHypothesisMethodClassICEFeasibility
1ActivationRemoving onboarding step 3 lifts Day-7 activation ≥5%A/BCausal8.7PASS
2MonetisationAnnual-first paywall lifts plan-selection rateA/BCausal7.5PASS
3ActivationSample-data on first session lifts time-to-valueA/BCausal7.2PASS
—AcquisitionLP hero image swapA/BDirectional5.0REJECT (low traffic at planned MDE)
—ReferralInvite-copy A/BA/B—4.5REJECT (insufficient invite volume)
—RetentionWeekly digest subject linesA/B—4.0REJECT (program-level holdout missing — fix that first)

Recommendation: route #1 to experiment-spec.


Common Rationalizations

ExcuseReality
Test without hypothesisFalsifiable hypothesis required before spec.
Peek until significantPeek policy must be pre-committed in spec.
Any metric goesPrimary + guardrail metrics defined up front.
Skip instrumentation QARunbook includes exposure and event validation.

Verification

  • Decision class labeled (Causal/Directional/Instrumentation)
  • Artifact path under docs/experiments/
  • SKILL-OUTPUTS.md updated for file outputs
  • Rollback or stop rule documented

Red Flags

  • Backlog item missing funnel surface or hypothesis sentence
  • High ICE item kept despite hard feasibility failure
  • ICE scores self-inflated without anchor to past wins
  • Retention experiment listed without long-running holdout plan

Reference Files

  • references/prioritization-rubric.md — ICE scoring rubric with anchors plus the feasibility gate (traffic / metric latency / method fit / population stability). Read in Step 3.

(Shared from sibling: experimentation/references/funnel-surface-map.md and experimentation/references/method-selector.md.)


Prune Log

Last pruned: 2026-07-04

  • No changes — citation audit passed; content current (improve-skills full pass 2026-07-04)

Impact Report

After updating the backlog, emit:

Backlog path: docs/experiments/backlog.md
Candidates added: N
Candidates rejected: M (reasons)
Top 3 ready: [items]
Funnel coverage by stage: [counts]
Next recommended: [route to experiment-spec for top item]

Append to docs/skill-outputs/SKILL-OUTPUTS.md: | YYYY-MM-DD HH:MM | experiment-backlog | docs/experiments/backlog.md | <change summary> |

レビュー

まだレビューはありません。使ってみた感想をお寄せください。

同じリポジトリのスキル

概要と使いどころ

Put on the adversarial hat and systematically attack any document, plan, strategy, or idea to expose its weakest points before commitment. Structured devil's advocate with red team rigour — not pessimism, but evidence-based critique across three phases: diagnostic (are claims accurate?), creative (is the problem artificially constrained?), challenge (are solutions robust?). Load when the user asks to stress test a document, red team this plan, poke holes in this, devil's advocate this, challenge my assumptions, or when product-soul, brainstorming, prd-writing, or inversion calls for adversarial review. Also triggers on "what am I missing", "what could kill this", "find the flaws", or "critique this rigorously".

日本語の概要は準備中です。原文の説明を表示しています。

dvy1987/agent-loom32026年8月8日 更新

Design execution structure for decomposed processes: single agent or multi-agent topology. Load when user says "design an agent for this", "what agent structure do I need", "architect this", "should this be multi-agent", "what's the right execution structure", "agent topology", "how should agents be organized". Takes process-decomposer output as primary input. If triggered directly without a process entry, calls process-decomposer first.

日本語の概要は準備中です。原文の説明を表示しています。

dvy1987/agent-loom32026年8月8日 更新

Internal skill. Called by setup-evaluation after a PASS. Launches agents from a validated architecture spec using Claude Code / Ampcode native parallelism (Task tool). Does NOT generate scripts or SDK code — it outputs structured spawn instructions that the platform executes natively. Never invoked directly by the user. Never launches without a setup-evaluation PASS.

日本語の概要は準備中です。原文の説明を表示しています。

dvy1987/agent-loom32026年8月8日 更新

Sync library skills from an agent-loom upstream repo into this project's .agents/skills while preserving project-local and forked skills. Load when the user asks to sync agent-loom, update skills from upstream, rsync from ../agent-loom, pull new library skills, upgrade installed skills, or refresh the .agents folder without losing custom project skills. Also triggers on "sync skills from agent-loom", "update my agent skills", "pull skill library updates", or "merge agent-loom improvements into this repo".

日本語の概要は準備中です。原文の説明を表示しています。

dvy1987/agent-loom32026年8月8日 更新

Instrument a shipped product's AI agents with tracing and observability so you can see what they did, why outputs happened, and what each run cost. Plain-language primer plus free-tier-first backend selection (Langfuse, Phoenix, LangSmith, Braintrust) and OpenTelemetry/OpenInference instrumentation. Load when the user asks to add observability, add tracing, instrument my agents, see what my agent is doing in production, set up Langfuse or Phoenix or LangSmith, debug why my agent gave a bad answer, or track LLM cost per request. Also fires when agent-system-architecture or setup-evaluation requires an observability plan for an agent-chain product. NOT for tracing the coding agent itself — that is run-trace. Precondition for runtime-learning-loop.

日本語の概要は準備中です。原文の説明を表示しています。

dvy1987/agent-loom32026年8月8日 更新

Run a structured retrospective after development-phase runs of your product's agents — interview the owner in plain language about what went well and poorly, draft ranked improvement hypotheses, then design and run small n=1/n=2 experiments with pre-declared success criteria, guardrails, stop conditions, and a cost/ROI kill-switch. Load when the user says how did that run go, retro this run, the agent output was bad, what should we improve, draft hypotheses, run a small experiment, or after repeated dev runs of an agentic system produce uneven quality. Priority: output quality over performance over cost, each with diminishing-returns stops. NOT a product A/B test (experimentation), NOT coding-agent harness repair (harness-evolution), NOT production-scale learning (runtime-learning-loop).