本文へ移動
cccskills
無料GitHub で公開

codexkit-fpa-rolling-forecast

Build and maintain a rolling financial forecast using a 12–18 month horizon. Lock actuals, reforecast remaining periods, extend the planning window, and generate a waterfall bridge showing prior-to-new variance. Use monthly or quarterly when the organization follows a continuous planning cadence instead of annual budgets.

インストール方法を見る

含まれるファイル(2)

  • SKILL.md5.0 KB
  • agents/openai.yaml173 B

SKILL.md(原文)

インストールする前に、エージェントに与えられる指示の中身を確認できます。

Rolling Forecast Builder

When to Use

  • Monthly or quarterly when updating financial projections
  • When replacing static annual budgets with continuous planning
  • When management needs a forward-looking 12–18 month view at all times
  • When actuals deviate significantly and re-forecasting is required

Procedure

Step 1 — Lock Actuals

  1. Import actuals for completed periods from the ERP or accounting system
  2. Freeze these periods — no further edits allowed
  3. Calculate YTD variance vs prior forecast for each line item

Step 2 — Reforecast Remaining Periods

  1. For each P&L line, update the driver assumptions:
    • Revenue: units × price, or pipeline × conversion rate
    • COGS: volume × unit cost, or % of revenue
    • OpEx: headcount × avg cost, or run-rate with known changes
  2. Apply known one-time items (restructuring, capex, etc.)
  3. Document every assumption change vs prior forecast

Step 3 — Extend Horizon

  1. Add new periods to maintain the 12–18 month rolling window
  2. Use trailing actuals + seasonality patterns to seed new periods
  3. Flag any new periods with lower confidence level

Step 4 — Sensitize Scenarios

  1. Apply Base / Bull / Bear assumptions to key drivers
  2. Show range around the forecast (not a single number)

Step 5 — Generate Waterfall Bridge

  1. Start with Prior Forecast for the full period
  2. Add variance buckets: Volume | Price/Mix | Timing | Cost | FX | One-offs
  3. Arrive at New Forecast
  4. Summarize the top 5 variance drivers in narrative form

Inputs

InputRequiredFormat
Actuals YTDYesP&L by month
Prior forecastYesP&L by month for forecast period
Driver assumptions updatesYesLine-by-line changes with rationale
Seasonality patternRecommendedHistorical % distribution by month

Output

## Rolling Forecast — [Period] Update

### P&L Summary (in $000s)

| Line | YTD Actual | Remaining Forecast | Full Year | vs Prior | Δ% |
|------|-----------|-------------------|-----------|---------|-----|
| Revenue | 12,400 | 19,200 | 31,600 | +1,600 | +5.3% |
| COGS | (5,200) | (8,100) | (13,300) | (400) | +3.1% |
| Gross Profit | 7,200 | 11,100 | 18,300 | +1,200 | +7.0% |
| OpEx | (4,800) | (7,600) | (12,400) | (200) | +1.6% |
| EBITDA | 2,400 | 3,500 | 5,900 | +1,000 | +20.4% |

### Waterfall Bridge (Revenue)

Prior Forecast: $30,000
  + Volume: +$800 (higher unit sales in Q3)
  + Price/Mix: +$500 (premium tier adoption)
  + Timing: +$300 (deal pulled forward)
  = New Forecast: $31,600

### Assumption Log

| Driver | Prior | New | Rationale |
|--------|-------|-----|-----------|
| Q3 unit sales | 1,200 | 1,350 | Pipeline confirmed |
| Premium mix | 15% | 18% | Q2 trend extrapolated |
| Headcount | 45 | 47 | 2 new hires approved |

### Confidence Level: HIGH (months 1–6) / MEDIUM (months 7–12) / LOW (months 13–18)

Definition of Done

  • Actuals locked and frozen for completed periods
  • Remaining periods reforecast with updated assumptions
  • Horizon extended to maintain 12–18 month window
  • Waterfall bridge shows prior → new with variance buckets
  • Assumption log documents every change with rationale
  • Confidence level assigned by time horizon

Examples

Prompt

We are in Month 6 of FY2026. Here are our YTD actuals: [paste P&L]
Prior forecast for the full year was: [paste prior forecast]
Key changes: Q3 pipeline is 15% stronger, we approved 2 new hires, raw material cost increased 3%.
Generate a rolling forecast update with waterfall bridge.

Quality Criteria

  • Data sources and assumptions are explicitly stated
  • Calculations are reproducible from provided inputs
  • Visualizations or tables have clear labels, units, and time ranges
  • Caveats and confidence levels are documented for estimates

Verification (4C)

CheckQuestion
CorrectnessAre formulas, aggregations, and statistical methods applied correctly?
CompletenessDoes the analysis cover all requested metrics and time ranges?
Context-fitAre the chosen metrics relevant to the business question being answered?
ConsequenceIf this data were used for a decision today, what blind spots remain?

Edge Cases

  • Missing or incomplete data — Document gaps and their potential impact on conclusions. Provide ranges instead of point estimates.
  • Outliers skewing results — Report with and without outliers. Document the decision to include or exclude.
  • Changing data definitions mid-period — Split analysis at the change boundary and note the schema difference.

Changelog

  • v1.0.0 — Initial release

レビュー

まだレビューはありません。使ってみた感想をお寄せください。

同じリポジトリのスキル

概要と使いどころ

Design rigorous A/B test plans with hypothesis, sample size calculation, Minimum Detectable Effect (MDE), randomization strategy, and decision rules. Includes guardrail metrics and rollout playbook. Use when planning product experiments, conversion optimization, or data-driven feature decisions.

日本語の概要は準備中です。原文の説明を表示しています。

hoavdc/CodexKit252026年10月11日 更新

Review REST and GraphQL API designs for consistency, usability, and best practices. Covers naming conventions, versioning strategy, error format, pagination, authentication patterns, and breaking change detection. Use when reviewing API specs, designing new APIs, or auditing existing endpoints.

日本語の概要は準備中です。原文の説明を表示しています。

hoavdc/CodexKit252026年10月11日 更新

Write Architecture Decision Records (ADRs) following the Michael Nygard format. Captures context, options considered, decision rationale, and consequences. Use when making technology choices, framework selections, or any architectural decision that future developers need to understand.

日本語の概要は準備中です。原文の説明を表示しています。

hoavdc/CodexKit252026年10月11日 更新

Assess organizational readiness for financial audits (internal or external). Map assertions to account balances, check evidence completeness, score readiness using a Red/Amber/Green framework, and generate a remediation timeline. Aligned with SOX, IFRS, and GAAP audit standards. Use before scheduled audits or when preparing for first-time compliance.

日本語の概要は準備中です。原文の説明を表示しています。

hoavdc/CodexKit252026年10月11日 更新

Design safe recurring Codex automations with clear prompts, outputs, schedules, and gating rules.

日本語の概要は準備中です。原文の説明を表示しています。

hoavdc/CodexKit252026年10月11日 更新

Refine Product Backlog Items to meet INVEST criteria. Write User Stories with Acceptance Criteria in Given/When/Then format, estimate with Story Points, and flag dependencies. Use before sprint planning when backlog items need grooming. Do not use to prioritize the backlog — that is the Product Owner's decision.

日本語の概要は準備中です。原文の説明を表示しています。

hoavdc/CodexKit252026年10月11日 更新

hoavdc のスキルをすべて見る

このスキルの問題を報告する