Draft a project charter that defines scope, stakeholders, success criteria, and initial risk register. Covers problem statement, RACI matrix, milestone planning, and scope boundaries for both agile and classic methodologies. Use when kicking off a new project or initiative, formalizing scope after an informal start, aligning stakeholders before detailed planning begins, or transitioning from discovery to active project work.

インストール方法を見る

含まれるファイル(1)

  • SKILL.md9.4 KB

SKILL.md(原文)

インストールする前に、エージェントに与えられる指示の中身を確認できます。

Draft a Project Charter

Creates a structured project charter that establishes project boundaries, stakeholder agreements, and success criteria before detailed planning begins. Produces a comprehensive document covering scope, RACI assignments, milestone planning, and an initial risk register suitable for agile, classic, or hybrid project methodologies.

When to Use

  • Kicking off a new project or initiative
  • Formalizing scope after an informal project start
  • Aligning stakeholders before detailed planning begins
  • Creating a reference document for scope decisions during execution
  • Transitioning from discovery/ideation to active project work

Inputs

  • Required: Project name and brief description
  • Required: Primary stakeholder or sponsor
  • Optional: Existing documentation (proposals, briefs, emails)
  • Optional: Known constraints (budget, deadline, team size)
  • Optional: Methodology preference (agile, classic, hybrid)

Procedure

Step 1: Gather Project Context and Create Charter Template

Read any existing documentation (proposals, emails, briefs) to understand the project background. Identify the core problem or opportunity the project addresses. Create the charter file with a structured template that will be populated in subsequent steps.

Create a file named PROJECT-CHARTER-[PROJECT-NAME].md with this template:

# Project Charter: [Project Name]
## Document ID: PC-[PROJECT]-[YYYY]-[NNN]

### 1. Problem Statement
[2-3 sentences describing the problem or opportunity this project addresses]

### 2. Project Purpose
[What the project will achieve and why it matters]

### 3. Scope
#### In Scope
- [Deliverable 1]
- [Deliverable 2]

#### Out of Scope
- [Exclusion 1]
- [Exclusion 2]

### 4. Deliverables
| # | Deliverable | Acceptance Criteria | Target Date |
|---|------------|---------------------|-------------|
| 1 | | | |

### 5. Stakeholders & RACI
| Stakeholder | Role | D1 | D2 | D3 |
|-------------|------|----|----|-----|
| | | | | |

*R=Responsible, A=Accountable, C=Consulted, I=Informed*

### 6. Success Criteria
| # | Criterion | Measure | Target |
|---|-----------|---------|--------|
| 1 | | | |

### 7. Milestones
| Milestone | Target Date | Dependencies |
|-----------|-------------|--------------|
| | | |

### 8. Risk Register
| ID | Risk | Likelihood | Impact | Severity | Mitigation | Owner |
|----|------|------------|--------|----------|------------|-------|
| R1 | | | | | | |

*Likelihood/Impact: Low, Medium, High*
*Severity = Likelihood × Impact*

### 9. Assumptions and Constraints
#### Assumptions
- [Key assumption 1]

#### Constraints
- [Key constraint 1]

### 10. Approval
| Role | Name | Date |
|------|------|------|
| Sponsor | | |
| Project Lead | | |

Fill in the document ID using format PC-[PROJECT]-[YYYY]-[NNN] (e.g., PC-WEBSITE-2026-001). Write a problem statement (2-3 sentences) that describes the current situation, the gap, and the impact. Write a project purpose statement (1 paragraph) explaining what will be achieved.

Expected: Charter file created with document ID, problem statement, and purpose filled in. Problem statement is specific and describes a measurable gap.

On failure: If project context is unclear, document specific questions for the sponsor in a QUESTIONS section at the top of the charter. If existing docs conflict, note contradictions in an OPEN ISSUES section and flag for stakeholder resolution.

Step 2: Define Scope Boundaries

Create explicit lists of what is and is not included in the project scope. Write 3-5 in-scope deliverables with specific acceptance criteria for each. Write 3-5 out-of-scope items to prevent scope creep. Populate the Deliverables table with each deliverable, its acceptance criteria, and a target date.

Expected: Scope section has balanced in-scope and out-of-scope lists. Deliverables table contains 3-5 entries with specific, testable acceptance criteria. Target dates are realistic and sequenced logically.

On failure: If deliverables are vague, break down each into sub-deliverables with concrete outputs. If acceptance criteria are missing, ask: "How would we demonstrate this deliverable is complete?" If target dates are unavailable, mark as TBD and flag for milestone planning session.

Step 3: Identify Stakeholders and Assign RACI

List all individuals or groups who will be affected by, contribute to, or have decision authority over the project. Include their organizational role. Create a RACI matrix mapping each stakeholder to each deliverable using:

  • R (Responsible): Does the work
  • A (Accountable): Final decision authority (only one A per deliverable)
  • C (Consulted): Provides input before decisions
  • I (Informed): Kept updated on progress

Ensure each deliverable has exactly one A and at least one R.

Expected: Stakeholders table lists 5-10 people with their roles. RACI matrix has one A per deliverable column. No deliverable is missing an R or has multiple As. Sponsor is A for final approval.

On failure: If stakeholder list is incomplete, cross-reference with organization chart and meeting attendees from discovery phase. If multiple As are identified, escalate the conflict to the sponsor for decision authority clarification. If no R exists, flag deliverable as unassigned and requiring resource allocation.

Step 4: Define Success Criteria and Milestones

Write 3-5 measurable success criteria using SMART format (Specific, Measurable, Achievable, Relevant, Time-bound). Each criterion should tie to a quantifiable measure and target value. Define 4-6 key milestones representing major project stages or deliverable completions, with target dates and dependencies on prior milestones.

Expected: Success Criteria table has 3-5 entries with specific measures (e.g., "System uptime" measured as "% availability" with target "99.5%"). Milestones table shows logical project phases with realistic target dates. Dependencies are clearly noted.

On failure: If success criteria are vague (e.g., "improve quality"), rewrite as measurable outcomes with baseline and target values. If milestone dates are unrealistic, work backward from final deadline using estimated durations and buffers. If dependencies create circular logic, restructure milestone sequence or split conflicting milestones.

Step 5: Create Initial Risk Register

Identify 5-10 risks that could impact project success. For each risk, assess likelihood (Low/Medium/High) and impact (Low/Medium/High), then calculate severity. Define a specific mitigation strategy for each risk and assign a risk owner responsible for monitoring and response. Include at least one risk in each category: scope, schedule, resource, technical, and external.

Expected: Risk Register has 5-10 entries covering scope, schedule, resource, technical, and external risks. Each risk has likelihood, impact, and severity assessed. Mitigation strategies are actionable and specific. Each risk has an assigned owner.

On failure: If risk list is incomplete, review scope boundaries, dependencies, stakeholder list, and assumptions for potential failure points. If mitigation strategies are generic ("monitor closely"), specify: What will be monitored? How often? What triggers action? If no one accepts risk ownership, assign to project lead temporarily and escalate to sponsor.

Validation

  • Charter file created with document ID
  • Problem statement is specific and measurable
  • Scope has both in-scope and out-of-scope items
  • RACI matrix covers all deliverables
  • Success criteria are measurable (SMART)
  • At least 5 risks identified with mitigation strategies
  • Milestones have target dates
  • Approval section included

Common Pitfalls

  • Scope without boundaries: Listing in-scope items without explicit out-of-scope items leads to scope creep. Always define what you won't do.
  • Vague success criteria: "Improve performance" is unmeasurable. Tie every criterion to a number with a baseline and target.
  • Missing stakeholders: Overlooked stakeholders surface late and derail the project. Cross-reference org charts and prior project communications.
  • Risk register as checkbox: Listing risks without actionable mitigation plans provides false confidence. Each risk needs a specific response strategy.
  • Over-detailed charter: The charter is a compass, not a map. Keep it to 2-4 pages. Detailed planning happens later.

Related Skills

  • create-work-breakdown-structure — decompose charter deliverables into work packages
  • manage-backlog — translate charter scope into a prioritized backlog
  • plan-sprint — plan the first sprint from charter deliverables
  • generate-status-report — report progress against charter milestones
  • conduct-retrospective — review charter assumptions after execution

レビュー

まだレビューはありません。使ってみた感想をお寄せください。

同じリポジトリのスキル

概要と使いどころ

Execute structural metamorphosis using strangler fig migration, chrysalis phases, and interface preservation. Covers transformation planning, parallel running, progressive cutover, rollback design, and post-metamorphosis stabilization for system architecture evolution. Use when assess-form has classified the system as READY for transformation, when migrating from monolith to microservices, when replacing a core subsystem while dependents continue operating, or when any architectural change must be gradual rather than big-bang.

日本語の概要は準備中です。原文の説明を表示しています。

pjt222/agent-almanac372026年10月12日 更新

adaptic

無料

Master skill composing the 5-step synoptic cycle for panoramic synthesis across multiple domains. Orchestrates meditate, expand-awareness, observe, awareness, integrate-gestalt, and express-insight into a coherent process that produces unified understanding rather than sequential compromise. Use when a problem genuinely spans 3+ domains and the interactions between domains matter more than depth in any one, when sequential analysis feels like compromise rather than integration, or before major architectural decisions affecting multiple stakeholders.

日本語の概要は準備中です。原文の説明を表示しています。

pjt222/agent-almanac372026年10月12日 更新

Scaffold a new puzzle type across all 10+ pipeline integration points in jigsawR. Creates the core puzzle module, wires it into the unified pipeline (generation, positioning, rendering, adjacency), adds ggpuzzle geom/stat layers, updates DESCRIPTION and config.yml, extends the Shiny app, and creates a comprehensive test suite. Use when adding a completely new puzzle type to the package or following the 10-point integration checklist to ensure nothing is missed end-to-end.

日本語の概要は準備中です。原文の説明を表示しています。

pjt222/agent-almanac372026年10月12日 更新

Add Rcpp or RcppArmadillo integration to an R package for high-performance C++ code. Covers setup, writing C++ functions, RcppExports generation, testing compiled code, and debugging. Use when an R function is too slow and profiling confirms a bottleneck, when you need to interface with existing C/C++ libraries, or when implementing algorithms (loops, recursion, linear algebra) that benefit from compiled code.

日本語の概要は準備中です。原文の説明を表示しています。

pjt222/agent-almanac372026年10月12日 更新

aikido

無料

Practice aikido as a defensive martial art emphasizing harmony, redirection, and controlled resolution. Covers centering and grounding, ukemi (safe falling and rolling), core techniques (irimi-nage, shiho-nage, kote-gaeshi, ikkyo), blending and tai sabaki (body movement), randori (multiple attacker practice), weapons awareness, and applying principles off the mat. Use when learning a defensive martial art that prioritizes de-escalation, developing the ability to redirect aggression without causing unnecessary harm, building safe falling skills, or cultivating calm centeredness under physical pressure.

日本語の概要は準備中です。原文の説明を表示しています。

pjt222/agent-almanac372026年10月12日 更新

Analyze an arbitrary codebase to identify functions, APIs, and data sources suitable for exposure as MCP tools, producing a tool specification document. Use when planning an MCP server for an existing project, auditing a codebase before wrapping it as an AI-accessible tool surface, comparing what a codebase can do versus what is already exposed via MCP, or generating a tool spec to hand off to scaffold-mcp-server.

日本語の概要は準備中です。原文の説明を表示しています。

pjt222/agent-almanac372026年10月12日 更新

pjt222 のスキルをすべて見る

このスキルの問題を報告する