Fast sprint status check. Reads the current sprint plan, scans story files for status, and produces a concise progress snapshot with burndown assessment and emerging risks. Run at any time during a sprint for quick situational awareness. Use when user asks 'how is the sprint going', 'sprint update', 'show sprint progress'.

インストール方法を見る

含まれるファイル(1)

  • SKILL.md8.0 KB

SKILL.md(原文)

インストールする前に、エージェントに与えられる指示の中身を確認できます。

Sprint Status

This is a fast situational awareness check, not a sprint review. It reads the current sprint plan and story files, scans for status markers, and produces a concise snapshot in under 30 lines. For detailed sprint management, use /sprint-plan update or /milestone-review.

This skill is read-only. It never proposes changes, never asks to write files, and makes at most one concrete recommendation.


1. Find the Sprint

Argument: $ARGUMENTS[0] (blank = use current sprint)

  • If an argument is given (e.g., /sprint-status 3), search production/sprints/ for a file matching sprint-03.md, sprint-3.md, or similar. Report which file was found.
  • If no argument is given, find the most recently modified file in production/sprints/ and treat it as the current sprint.
  • If production/sprints/ does not exist or is empty, report: "No sprint files found. Start a sprint with /sprint-plan new." Then stop.

Read the sprint file in full. Extract:

  • Sprint number and goal
  • Start date and end date
  • All story or task entries with their priority (Must Have / Should Have / Nice to Have), owner, and estimate

2. Calculate Days Remaining

Using today's date and the sprint end date from the sprint file, calculate:

  • Total sprint days (end minus start)
  • Days elapsed
  • Days remaining
  • Percentage of time consumed

If the sprint file does not include explicit dates, note "Sprint dates not found — burndown assessment skipped."


3. Scan Story Status

First: check for production/sprint-status.yaml.

If it exists, read it directly — it is the authoritative source of truth. Extract status for each story from the status field. No markdown scanning needed. Use its sprint, goal, start, end fields instead of re-parsing the sprint plan.

If sprint-status.yaml does not exist (legacy sprint or first-time setup), fall back to markdown scanning:

  1. If the entry references a story file path, check if the file exists. Read the file and scan for status markers: DONE, COMPLETE, IN PROGRESS, BLOCKED, NOT STARTED (case-insensitive).
  2. If the entry has no file path (inline task in the sprint plan), scan the sprint plan itself for status markers next to that entry.
  3. If no status marker is found, classify as NOT STARTED.
  4. If a file is referenced but does not exist, classify as MISSING and note it.

When using the fallback, add a note at the bottom of the output: "⚠ No sprint-status.yaml found — status inferred from markdown. Run /sprint-plan update to generate one."

Optionally (fast check only — do not do a deep scan): grep src/ for a directory or file name that matches the story's system slug to check for implementation evidence. This is a hint only, not a definitive status.

Stale Story Detection

After collecting status for all stories, check each IN PROGRESS story for staleness:

  • For each story that has a referenced file, read the file and look for a Last Updated: field in the frontmatter or header (e.g., Last Updated: 2026-04-01 or updated: 2026-04-01). Accept any reasonable date field name: Last Updated, Updated, last-updated, updated_at.
  • Calculate days since that date using today's date.
  • If the date is more than 2 days ago, flag the story as STALE.
  • If no date field is found in the story file, note "no timestamp — cannot check staleness."
  • If the story has no referenced file (inline task), note "inline task — cannot check staleness."

STALE stories are included in the output table and collected into an "Attention Needed" section (see Phase 5 output format).

Stale story escalation: If any IN PROGRESS story is flagged STALE, the burndown verdict is upgraded to at least At Risk — even if the completion percentage is within the normal On Track window. Record this escalation reason: "At Risk — [N] story(ies) with no progress in [N] days."


4. Burndown Assessment

Calculate:

  • Tasks complete (DONE or COMPLETE)
  • Tasks in progress (IN PROGRESS)
  • Tasks blocked (BLOCKED)
  • Tasks not started (NOT STARTED or MISSING)
  • Completion percentage: (complete / total) * 100

Assess burndown by comparing completion percentage to time consumed percentage:

  • On Track: completion % is within 10 points of time consumed % or ahead
  • At Risk: completion % is 10-25 points behind time consumed %
  • Behind: completion % is more than 25 points behind time consumed %

If dates are unavailable, skip the burndown assessment and report "On Track / At Risk / Behind: unknown — sprint dates not found."


5. Output

Keep the total output to 30 lines or fewer. Use this format:

## Sprint [N] Status — [Today's Date]
**Sprint Goal**: [from sprint plan]
**Days Remaining**: [N] of [total] ([% time consumed])

### Progress: [complete/total] tasks ([%])

| Story / Task         | Priority   | Status      | Owner   | Blocker        |
|----------------------|------------|-------------|---------|----------------|
| [title]              | Must Have  | DONE        | [owner] |                |
| [title]              | Must Have  | IN PROGRESS | [owner] |                |
| [title]              | Must Have  | BLOCKED     | [owner] | [brief reason] |
| [title]              | Should Have| NOT STARTED | [owner] |                |

### Attention Needed
| Story / Task         | Status      | Last Updated   | Days Stale | Note           |
|----------------------|-------------|----------------|------------|----------------|
| [title]              | IN PROGRESS | [date or N/A]  | [N days]   | [STALE / no timestamp — cannot check staleness / inline task — cannot check staleness] |

*(Omit this section entirely if no IN PROGRESS stories are stale or have timestamp concerns.)*

### Burndown: [On Track / At Risk / Behind]
[1-2 sentences. If behind: which Must Haves are at risk. If on track: confirm
and note any Should Haves the team could pull.]

### Must-Haves at Risk
[List any Must Have stories that are BLOCKED or NOT STARTED with less than
40% of sprint time remaining. If none, write "None."]

### Emerging Risks
[Any risks visible from the story scan: missing files, cascading blockers,
stories with no owner. If none, write "None identified."]

### Recommendation
[One concrete action, or "Sprint is on track — no action needed."]

6. Fast Escalation Rules

Apply these rules before outputting, and place the flag at the TOP of the output if triggered (above the status table):

Critical flag — if Must Have stories are BLOCKED or NOT STARTED and less than 40% of the sprint time remains:

SPRINT AT RISK: [N] Must Have stories are not complete with [X]% of sprint
time remaining. Recommend replanning with `/sprint-plan update`.

Completion flag — if all Must Have stories are DONE:

All Must Haves complete. Team can pull from Should Have backlog.

Missing stories flag — if any referenced story files do not exist:

NOTE: [N] story files referenced in the sprint plan are missing.
Run `/story-readiness sprint` to validate story file coverage.

Collaborative Protocol

This skill is read-only. It reports observed facts from files on disk.

  • It does not update the sprint plan
  • It does not change story status
  • It does not propose scope cuts (that is /sprint-plan update)
  • It makes at most one recommendation per run

For more detail on a specific story, the user can read the story file directly or run /story-readiness [path].

For sprint replanning, use /sprint-plan update. For end-of-sprint retrospective, use /milestone-review.

レビュー

まだレビューはありません。使ってみた感想をお寄せください。

同じリポジトリのスキル

概要と使いどころ

adopt

無料

Brownfield onboarding — audits existing project artifacts for template format compliance (not just existence), classifies gaps by impact, and produces a numbered migration plan. Run this when joining an in-progress project or upgrading from an older template version. Distinct from /project-stage-detect (which checks what exists) — this checks whether what exists will actually work with the template's skills.

日本語の概要は準備中です。原文の説明を表示しています。

striderZA/OpenCodeGameStudios912026年10月7日 更新

Creates an Architecture Decision Record (ADR) documenting a significant technical decision, its context, alternatives considered, and consequences. Every major technical choice should have an ADR.

日本語の概要は準備中です。原文の説明を表示しています。

striderZA/OpenCodeGameStudios912026年10月7日 更新

Validates completeness and consistency of the project architecture against all GDDs. Builds a traceability matrix mapping every GDD technical requirement to ADRs, identifies coverage gaps, detects cross-ADR conflicts, verifies engine compatibility consistency across all decisions, and produces a PASS/CONCERNS/FAIL verdict. The architecture equivalent of /design-review.

日本語の概要は準備中です。原文の説明を表示しています。

striderZA/OpenCodeGameStudios912026年10月7日 更新

art-bible

無料

Guided, section-by-section Art Bible authoring. Creates the visual identity specification that gates all asset production. Run after /concept-brainstorm is approved and before /map-systems or any GDD authoring begins.

日本語の概要は準備中です。原文の説明を表示しています。

striderZA/OpenCodeGameStudios912026年10月7日 更新

Generates placeholder .aseprite files from asset specs using the Aseprite MCP. Reads asset specs and art bible, creates sprites with correct dimensions/palette/layers, exports PNGs. Run after /asset-spec has produced specs and /art-bible exists.

日本語の概要は準備中です。原文の説明を表示しています。

striderZA/OpenCodeGameStudios912026年10月7日 更新

Audits game assets for compliance with naming conventions, file size budgets, format standards, and pipeline requirements. Identifies orphaned assets, missing references, and standard violations.

日本語の概要は準備中です。原文の説明を表示しています。

striderZA/OpenCodeGameStudios912026年10月7日 更新

striderZA のスキルをすべて見る

このスキルの問題を報告する